Georg Tveit | Sannidal, Norvay
Project type
Production
Location
Sannidal, Norvay
Task: production of the main steel structure, conveyor and crusher
The plant is designed to maximize the efficiency of the mass flow and make the best possible use of the location, including a short distance from quarry to crusher for dump trucks, and the plant is built so that the material-flow follows the gravity so that the energy requirement is reduced.